High-Voltage Network Management and Infrastructure Development Ariel Sharon Park

  • Writer: עמי& יגאל
    עמי& יגאל
  • Oct 23, 2025
  • 2 min read

Updated: Feb 19

High-voltage grid connection, design and construction of transformer substations, and

development of primary cabling and entrance lighting infrastructure.


Ariel Sharon Park is one of Israel’s largest and most ambitious environmental projects,

requiring a comprehensive upgrade of its electrical infrastructure to support the growing

power demands of the entire site.


The central challenge was to regulate and establish the park’s high-voltage grid connection

while managing a complex engineering process that involved close coordination with the

park’s management, the Israel Electric Corporation, and a multidisciplinary team of

consultants.


Ami & Igal was appointed as the main contractor for the project, leading it from the

conceptual planning stage through to full system commissioning.


Integrated Design and Execution


We delivered a detailed engineering design and full execution of the park’s main power

supply and lighting network:


  • High-Voltage Infrastructure

    Complete civil and electrical works for the construction of transformer substations

    and the main high-voltage switchgear room, including structural design,

    foundations, and equipment integration.


  • Primary Power Distribution

    Complex installation of underground high-voltage and main feeder lines supplying

    power across the park, executed in strict compliance with regulatory standards and

    under full approval of the electric utility.


  • Road and Entrance Lighting

    Development of a new street and roadway lighting network at the park’s main

    entrance, ensuring high safety standards while delivering an aesthetic lighting

    solution aligned with the park’s natural and architectural character.


  • Regulatory Coordination and System Integration

    Comprehensive management of all regulatory processes, including final grid

    connection and system testing in coordination with the electric utility, alongside

    continuous collaboration with park management and project consultants.


The Result

A stable power supply and a clearly defined, illuminated entrance.


Through meticulous management, proven expertise in high-voltage systems, and strong

multi-stakeholder coordination, the project was completed successfully. Ariel Sharon Park

now benefits from a safe, reliable, and well-organized electrical network, while its entrance

has been transformed into a functional, accessible, and well-lit gateway for the millions of

visitors who enter the park each year.